Fire Safety Constructions were appointed on a design and construct basis to install a compliant hydrant system to AS2419.1-2005 for this recently refurbished building.
The installation included a 100mm street connection to Pittwater Road, external suction/booster, landing values on each level and an external pillar.
The works were completed within a 6 week programme and installed with minimum disruption to existing residents.